没有找到合适的产品?
联系客服协助选型:023-68661681
提供3000多款全球软件/控件产品
针对软件研发的各个阶段提供专业培训与技术咨询
根据客户需求提供定制化的软件开发服务
全球知名设计软件,显著提升设计质量
打造以经营为中心,实现生产过程透明化管理
帮助企业合理产能分配,提高资源利用率
快速打造数字化生产线,实现全流程追溯
生产过程精准追溯,满足企业合规要求
以六西格玛为理论基础,实现产品质量全数字化管理
通过大屏电子看板,实现车间透明化管理
对设备进行全生命周期管理,提高设备综合利用率
实现设备数据的实时采集与监控
利用数字化技术提升油气勘探的效率和成功率
钻井计划优化、实时监控和风险评估
提供业务洞察与决策支持实现数据驱动决策
企业级工作流解决方案的代表,实时跟踪事件的企业级业务活动监控(BAM),更加直观的运营控制,强大实力的体现。
标签:工作流业务活动监控开发商: HandySoft
产品类型:控件
产品功能:工作流
平台语言:JAVA
开源水平:不提供源码
本产品的分类与介绍仅供参考,具体以商家网站介绍为准,如有疑问请来电 023-68661681 咨询。
自1999年首次发布,BizFlow®已成为提供流程驱动的解决方案的领先的BPM套件。其成功的关键在于HandySoft对易用性的专注。业务分析师和IT开发人员都拥有建模,仿真,执行和优化强大的,功能丰富的应用程序的能力,这些应用程序专门针对自己独特的要求简化并自动化业务流程。
Since its initial release in 1999, BizFlow® has been the leading BPM Suite for delivering process-driven solutions. Key to its success has been HandySoft’s singular focus on ease of use. Business Analysts and IT Developers alike have the ability to model, simulate, execute and optimize powerful, feature rich applications designed to streamline and automate business processes specifically addressing their unique requirements.
Now on BizFlow® v11.3, HandySoft is the first (and continues to be the only) BPM solution provider enabling users to seamlessly automate and integrate dynamic tasks with structured process. Customers hail this functionality as critically important to meeting their dynamic business application requirements.
* 关于本产品的分类与介绍仅供参考,精准产品资料以官网介绍为准,如需购买请先行测试。
HandySoft是第一个BPM解决方案提供商,使用户能够无缝地自动化和集成动态的具有结构化的流程的任务。客户们赞叹这些功能,因为他们对满足他们动态的业务应用要求至关重要。
HandSoft提供的BizFlow作为市场上最具有活力的BPM解决方案平台。我们可以重一下几点看出:
支持动态BPM
动态BPM认为由于企业的组织变化(例如,不断变化的劳动力,业务目标,和竞争的现实)和技术变革(例如,新的应用和新的功能)导致业务流程不断演变,同时企业应该在他们的职权范围内分配相应人员到各个流程中以适当的提高工人的效率。因此,企业需要一个能够支持快速概念化和创建灵活的应用的业务流程平台。
为业务用户和IT专业人士设计并构建支持动态业务环境,BizFlow跳出了传统的流程管理解决方案的单调的,一维的外观感觉。它提供了生动的细分展开功能,完整的关键路径识别和分析,以及增强的动态流程自动化。其每项的关键点是,下一代功能提供给用户部署业务流程的能力,这些功能能够适应和随着企业的不断变化的业务环境不断演变。
提供动态业务应用程序
在高性能工作的今天,用户们需要能够满足他们在灵活性,敏捷性,管理透明性,流程校准,和具有丰富的用户体验需求的业务应用程序。
使用BizFlow版本11系列,我们真正提供了用于创建动态业务应用程序的市场上的一个BPM套件。用户能够构建满足快速修改和执行,变量条件,和短时条件需求的应用程序。它们还可以为实时监控和决策提供概念化流程信息。并只有使用BizFlow,用户们才能得到无缝地自动化和集成动态的具有结构化的流程的任务,在一个企业中所发生的所有工作之上驱动可视性,控制,和生产力。
提供ROI
世界范围内数以百计的企业使用BizFlow创建动态的业务应用程序,至今提供了50%到500%之间的回报率的价值。例如,三星公司使用BizFlow在他们的重工业和保险业经营中。在短短两年的实施中,三星的重工业在管理监督上节约了845,000美元,外购产品量增加了2,520,000美元,并降低了材料选择方面达到338,000美元。
在一个平台上整合了所有的BPM功能
BizFlow是一个全功能的BPM解决方案平台。创建一个流程驱动的应用程序所需要的一切都包括在内。功能和其基本功能包括:
流程建模功能
流程发现与建模密切相关。作为项目经理和业务分析人员要与开发人员协作,BizFlow的建模器将会利用相应的业务规则帮助捕获并说明工作流程。
用户们能够建模流程和子流程。例如,用户们能够轻松地定义子流程,如质量评审中的所有的文档工作相关的前期起源和核保都是提供给工人和小组进行审核的。一个集体的和个人的批准/转交或拒绝/返工子流程能够通过一点和点击界面来定义。
业务规则功能
将BizFlow从常见的工作流工具中分离作为一个BPM套件是一个综合的业务规则环境。从流程建模器右边,用户们可以双击活动来添加规则到每个活动或流程定义。
流程监控功能
每位HandySoft客户提到可视性的价值。它是许多源于BizFlow解决方案占据首位的优点。可视性加上业务分析提供了一种机制,以监测和报告业绩和风险。
使用BizFlow用户们能够看到流程的状态:谁在做什么,做了什么,瓶颈出现在哪里,和瓶颈原因。管理人员可以了解到他们需要做什么来提高生产力。用户们可以更多的合作,因为他们能够即时的访问附件和意见以及知道哪里发生了特殊的路径改变。
BizFlow超出了简单的图形化的流程工作项的显示。工人和管理人员可以很容易地从一个流程图发现重要的处理细节,如已用时间,在截止日期之前认为完成的实例,以及在处理的实例总数。
BizFlow现在为了提供给用户关键路径分析需要进一步的监测。关键路径是那些需要最长时间才能完成的流程。BizFlow实时监测关键路径并标记那些已达到了给定阈值的实例,以便工人能够响应瓶颈或异常处理政策。该功能帮助客户们确保交易满足最后期限同时支持SLA,监管要求和其他关键的业务目标。
动态分配任务功能
任务分配是常见的一种工作流程活动。BizFlow使流程参与者启动活动或停止正式的到任务和与其他人合作的流程。与电子邮件一样,具有的这种特殊路径功能支持并行处理。但是与电子邮件不一样的是,BizFlow在任务状态以及整个任务分配的控制上提供完整的可视性。
业务应用程序和表单开发功能
人到人的流程中大部分是围绕了表单,一个原因是因为BPM本身是与文档管理和记录管理平台相吻合的。
BizFlow提供的表单开发能力作为它本身的综合的业务应用程序开发环境的一部分。客户们能够使用BizFlow表单或其他表单技术,如Microsoft Office, Adobes PDF, ASP和JSP。此外,能够访问一个web发送的Adobe LiveCycle表单或Microsoft InfoPath表单的任何人现在都能在BizFlow中启动流程。通过这些表单捕获数据并提交到BizFlow处理。这样,BizFlow通过易用访问,易于使用和重用快速的提升ROI。灵活的用户界面与为全球的劳动力的协作
BizFlow是众所周知的具有卓越的可配置的终端用户界面。不像那些需要通过编码来自定义的系统,BizFlow的配置完全是通过点击和基于向导来完成的。这就意味着非技术人员能够按他们自己的需要自己更改,以及这些自定义是免费升级的。当一个BizFlow新版本推出时,不需要昂贵的再申请更改也可用。
BizFlow能够在被直接访问或被下放到几乎所有的符合JSR-168规范的门户环境中。客户可以将BizFlow portlets(又称BizCoves)分离为不同的门户区域。并且每个区域的UI按个人用户或用户组的需要是可配置的。再加上任何人能够从Web上通过Adobe LiveCycle和Microsoft InfoPath表单启动一个流程。不需要许可要求。
BizFlow还提供了在开发周期和流程运行期两者的许多协作功能。BizFlow能够捕获,并跟踪评论,任务,文档,和其他每个流程实例相关的附件,并使这些对每个贡献者都可用。
SOA集成功能
查找和输入数据到文档构成了平均每天工作的很大一部分。通过集成,流程驱动的应用程序能够将数据填充到表单和自动化的工作流程步骤中,如数据项,数据验证,和数据更改。
无论是通过适配器或Web服务,BizFlow擅于获取这些数据并将它们引入到工作流程中。使用BizFlow用户可以创建或重用web服务来连接应用程序表单到数据记录上。并使用即开即用的适配器BizFlow可以利用文档管理系统支持文档图像处理,版本控制和归档处理。
业务活动监测功能
流程可视性和控制基于管理流程的基本规则。每个规则的最后期限用来维持服务的等级,有效的业务政策的参数,最专业的参与者创建一个性能指标用于持续的流程优化的检测和积极反馈分析。
HandySoft presents BizFlow® as the most dynamic BPM solution platform is the marketplace. Consider the following:
BizFlow® enables Dynamic BPM.
Dynamic BPM holds that business processes constantly evolve due to both organizational change (e.g., changing workforce, business objectives, and competitive realities) and technological change (e.g., new applications and new capabilities), and that organizations should do everything in their power to align people with process to measurably enhance worker effectiveness. As a result, organizations need a ”business process platform” that supports rapid change and creates agile applications.
Designed for both business users and IT professionals and built to support dynamic business environments, BizFlow® moves beyond the flat, one-dimensional feel of traditional process management solutions. It offers vivid drill-down capabilities, sound critical path identification and analytics, as well as enhanced dynamic process automation. Each of these key, next-generation capabilities provides users the ability to deploy business processes that adapt to and evolve with an organization’s ever-changing business environment.
BizFlow® delivers “Dynamic Business Applications.”
In the high performance workplace of today, users need business applications that meet their needs for flexibility, agility, management visibility, process alignment, and a rich user experience.
With BizFlow v11 Series, we truly offer the marketplace a BPM Suite for creating dynamic business applications. Users can build applications for rapid modification and execution, variable conditions, and short-lived situational needs. They can also conceptualize process information for real-time executive monitoring and decision-making. And only with BizFlow® do users get to seamlessly automate and integrate dynamic tasks with structured processes to drive visibility, control, and productivity across all work that happens within an organization.
BizFlow® Delivers ROI.
Hundreds of organizations worldwide use BizFlow® to create dynamic business applications that deliver value measured to date between 50% and 500% ROI. For example, Samsung uses BizFlow® within their heavy industries and insurance operations. Within two years of implementation, Samsung Heavy Industries saved $845,000 in management oversight, increased outsourcing production volume by $2,520,000 and reduced material selection time by $338,000.
BizFlow® Combines All BPM Capabilities on One Platform:
BizFlow® is a full featured BPM solution platform. Everything needed to create a process-driven application is included. Functionality and their underlying capabilities include:
BizFlow® –Process Modeling Capabilities
Process discovery and modeling should go hand-in-hand. As Project Managers and Business Analysts collaborate with Developers, the BizFlow® modeler will help capture and illustrate workflow with corresponding business rules.
Users can model process and sub-process. For example, users can easily define a sub-process such as Quality Review where all of the paperwork associated with the upfront origination and underwriting is made available to a worker or team for review. A collective or singular approval/forward or reject/rework sub-process can all be defined via a point and click interface.
BizFlow® – Business Rules Capabilities
What separates BizFlow® as a BPM Suite from common workflow tools is the integrated business rules environment. Right from the process modeler, users can double-click activities to add business rules to each activity or process definition.
BizFlow® – Process Monitoring Capabilities
Every HandySoft customer mentions the value of visibility. It is the first benefit of many that stems from a BizFlow® solution. Visibility coupled with business analytics provides a mechanism to monitor and report on business performance and risks.
With BizFlow®, users can see process status – who is doing what, what has been done, where are the bottlenecks, and bottleneck causes. Managers can understand what they need to do to improve productivity. Users can be more collaborative because they have instant access to attachment and comments and understand what ad-hoc routing has occurred.
BizFlow goes beyond simple graphic displays of in-process work items. Workers and managers can easily drill through a process diagram to discover important process details such as time elapsed, deadlines pending, and total processed instances.
BizFlow now takes monitoring a step further in providing users Critical Path analysis. Critical paths are those requiring the most time to complete. BizFlow® monitors critical paths in real-time and flags those reaching assigned thresholds so that workers can respond to bottlenecks or exception handling policies. This capability helps customers to ensure transactions meet deadlines while supporting SLAs, regulatory requirements and other critical business objectives.
BizFlow® – Dynamic Tasking Capabilities
Tasking is a common workflow activity. BizFlow® enables process participants to initiate actions or punch out of formal processes to task and collaborate with others. Like email, this ad-hoc routing capability supports parallel processing. But unlike email, BizFlow provides complete visibility into task status as well as control over task distribution.
BizFlow® – Business Application and Forms Development Capabilities
Human-to-human processes largely revolve around forms, a reason why BPM naturally dovetails with document management and records management platforms.
BizFlow® delivers forms development capabilities as part of its integrated business application development environment. Customers can use BizFlow® forms or integrate with other form technology such as Microsoft Office, Adobe’s PDF, ASP and JSP. Furthermore, anyone allowed access to a web-posted Adobe LiveCycle form or Microsoft InfoPath form can now initiate processes within BizFlow. The data captured by these forms is submitted to BizFlow for processing. In this way, BizFlow® delivers ROI quickly through ease-of-access, ease-of-use and reuse.
BizFlow® – Flexible User Interfaces & Collaboration for Global Workforce
BizFlow® is widely known for its extremely configurable end user interfaces. Unlike systems that require customization through coding, BizFlow® configuration is completely point-and-click and wizard-based. That means non-technical people can make changes they need when they need them and that customizations are ‘upgrade free.’ There is no need to expensively re-apply changes when a new version of BizFlow® becomes available.
BizFlow® can be directly-accessed or dropped into almost any JSR-168 compliant portal environment. Customers can separate out BizFlow® portlets (aka “BizCoves”) into different portal areas. And each area within the UI is configurable to individual user or user group needs. Plus now anyone can initiate processes from the Web through forms from Adobe LiveCycle and Microsoft InfoPath. No licenses required.
BizFlow® also provides many collaboration features both in the development cycle and during process run-time. BizFlow® enables, captures, and tracks commentary, tasks, documents, and attachments associated with each process instance and makes that available to each contributor.
BizFlow® – SOA Integration Capabilities
Finding and entering data to documents makes up a large part of the average work day. Through integration, process-driven applications can pull data into forms, automating workflow steps such as data entry, data validation, and data changes.
Whether through adaptors or Web services, BizFlow® excels at getting at this data and introducing it into the workflow. With BizFlow® users can create or reuse web services to link application forms to data records. And using out-of-the-box adaptors BizFlow can harness document management systems to enable document imaging, versioning, and archiving.
BizFlow® – Business Activity Monitoring Capabilities
Process visibility and control is based on underlying rules governing workflow. Each rule – deadlines to maintain service levels, parameters for effective business policies, participants for best expertise– creates a performance indicator that can be monitored and analyzed for positive feedback for continual process optimization.
更新时间:2017-05-17 11:38:20.000 | 录入时间:2010-03-04 16:54:16.000 | 责任编辑:
全球第一且功能强大的.NET企业级业务流程管理和高级工作流解决方案
Skelta BPM.NET高级培训详细的介绍产品、流程开发及技术特征等深层次内容,现场进行流程需求分析,并结合示例讲解Skelta企业管理器、流程设计器、表单设计器、本地化方法等。
JobServerJobServer是可用于管理作业和环境的GUI工具集。
Addflow主要用于创建工作流程图、数据库关系图、通讯网络图、状态转换图、CRM图、质量控制图等
服务电话
重庆/ 023-68661681
华东/ 13452821722
华南/ 18100878085
华北/ 17347785263
客户支持
技术支持咨询服务
服务热线:400-700-1020
邮箱:sales@obta.cn
关注我们
地址 : 重庆市九龙坡区火炬大道69号6幢